| LOCATION | Alkhobar, AlDoha | |
| CLIENT | Eastern Province Municipality | |
| TYPE OF CONTRACT | Turn key. | |
| COMPLETED | on going | |
| SIZE |
|
|
The project involves the construction and finishing of Sun Garden School, adhering to the highest standards of quality and safety. The scope of work includes the following:
Excavation Work.
Concrete Structure Work.
HVAC & Fire Protection Systems.
Electrical & Sanitary Work.
Finishing & Interior Preparations.
Waterproofing Work.
- Rakah 1 Project - Sewage Connections. Reinforced concrete with steel bars is used to ensure strength and durability.
Carrying out excavation works as per the engineering plans.
Soil leveling and foundation preparation to ensure structural stability.
Constructing and casting reinforced concrete for foundations, columns, slabs, and walls according to technical specifications.
Ensuring the use of high-quality materials to enhance building strength and durability.
nstalling a complete air conditioning system to provide a comfortable learning environment.
Implementing fire protection systems in compliance with safety regulations.
Architectural Excellence Through Cost-Effective Structural and Mechanical Design
In the realm of architecture, structural and mechanical designs and optimization, our engineers skilled in selecting and designing structural systems that implement required architectural specifications while achieving lower costs without compromising on quality.
Keep In Touch



