| LOCATION | Al Jubail |
| CLIENT | Al Mana General Hospital |
| TYPE OF CONTRACT | Early works with Concrete Structure |
| SCOPE | Parking Building in Jubail |
| COMPLETED | 2023 |
| SIZE | 32000 m2 |
Scope of work
This includes site preparation before the commencement of main activities, such as clearing the site of debris or obstacles, marking project boundaries, and creating temporary access routes for machinery and equipment.
Involves removing soil to reach the required level for foundation construction. This is performed using specialized excavation equipment while ensuring precision as per the design plans.
Supporting excavation sides using specific techniques like steel or concrete panels to prevent soil collapse, especially in areas with unstable ground conditions.
Installing a system to remove groundwater from the site to keep the work area dry and safe during excavation and construction. This involves pumps and temporary drainage wells.
Includes casting concrete for foundations, columns, walls, and slabs according to engineering designs and specifications. Reinforced concrete with steel bars is used to ensure strength and durability.
Architectural Excellence Through Cost-Effective Structural and Mechanical Design
In the realm of architecture, structural and mechanical designs and optimization, our engineers skilled in selecting and designing structural systems that implement required architectural specifications while achieving lower costs without compromising on quality.