LOCATION Al Khobar
CLIENT Al Mana Hospitals (Renovation works by Khadija Al-Dayel)
TYPE OF CONTRACT Turn key
SCOPE The project involves structural enhancements, adding new floors and bridges, advanced finishing for healthcare facilities, modern electromechanical systems, and finalizing with high-quality interiors and comprehensive system testing.
COMPLETED 2024
SIZE  7500 m2
1. Strengthening the Existing Structure: * Reinforce the columns of the ground floor and first floor to support additional loads from the new floors. * Conduct detailed engineering studies to determine required load capacities and ensure the integrity of the existing structure. 2. Addition of Two New Floors: * Design and construct two new floors using Steel Structure in compliance with engineering standards and project requirements. * Provide adequate insulation for water and thermal protection. 3. Construction of Suspended Bridges: * Build two suspended bridges to connect the hospital building to adjacent buildings. * Design the bridges according to safety and quality standards using modern and durable materials.
1. Addition of a Pediatric Emergency Department: * Design and equip the pediatric emergency department with (7) beds. * Provide modern medical equipment and a centralized ventilation system tailored for emergency care. 2. Establishment of Women and Maternity Clinics: * Build and equip (32) women and maternity clinics with high-quality specifications. * Include patient waiting areas with comfortable amenities. 3. Creation of Operating Rooms: * Add (6) fully equipped operating rooms with state-of-the-art medical equipment. * Ensure compliance with safety and quality standards for operating facilities. 4. Installation of an Escalator: * Execute concrete cutting on the first floor to accommodate the escalator installation. * Ensure safety measures are in place during the cutting and installation process
1. HVAC Systems: * Install a modern centralized air conditioning system to serve all sections of the hospital. * Provide effective ventilation systems to maintain air quality. 2. Electrical and Lighting Systems: * Extend modern electrical networks to meet the demands of the new sections. * Install energy-efficient LED lighting systems. 3. Plumbing and Drainage Systems: * Upgrade plumbing and drainage systems to support the new floors. * Include emergency water drainage systems. 4. Fire and Safety Systems: * Install a modern fire alarm system and automated sprinkler system. * Add safe and accessible emergency exits. 5. Communication and IT Systems: * Install advanced communication networks to support internet and telephony services. * Set up CCTV surveillance systems and internal audio notification systems.
1. Interior Finishes: * Complete all wall and ceiling finishes with high-quality materials resistant to heat and humidity. * Install specialized flooring for healthcare facilities, particularly in operating rooms and emergency departments. 3. System Testing and Commissioning: * Test all systems (electrical, mechanical, and safety) to ensure they are operational and efficient.

Architectural Excellence Through Cost-Effective Structural and Mechanical Design

In the realm of architecture, structural and mechanical designs and optimization, our engineers skilled in selecting and designing structural systems that implement required architectural specifications while achieving lower costs without compromising on quality.

Keep In Touch