| LOCATION | Khobar |
| CLIENT | Mr. Mansour Al Manaa |
| TYPE OF CONTRACT | Early works with Concrete Structure. |
| COMPLETED | 2023 |
| SIZE | 10,000 m2 |
1. Total Area: 10,000 m2
2. Early Works.
3. Excavation Works.
4. Reinforced Concrete Works.
- This includes site preparation before the commencement of main activities, such as clearing the site of debris or obstacles, marking project boundaries, and creating temporary access routes for machinery and equipment.
- Involves removing soil to reach the required level for foundation construction. This is performed using specialized excavation equipment while ensuring precision as per the design plans.
- Includes casting concrete for foundations, columns, walls, and slabs according to engineering designs and specifications. Reinforced concrete with steel bars is used to ensure strength and durability.
Architectural Excellence Through Cost-Effective Structural and Mechanical Design
In the realm of architecture, structural and mechanical designs and optimization, our engineers skilled in selecting and designing structural systems that implement required architectural specifications while achieving lower costs without compromising on quality.
Keep In Touch








